CanalMan Hydraulic Model Version 5.42 April 1996 (Beta version)CanalMan was developed as an MS Windows 3.1 application. It runs under Windows 95
just as under Windows 3.1, but as yet it is not optimized for use under Windows 95.
6.6 Construction Manager. Immediately upon award of contract, the Construction Manager will be appointed to take control of all site construction activities. a) He will be responsible to Site Manager. Refer to site organizational chart, his team consists of: (to be updated as required) -Civil & Structure Team -Mechanical Team -Electrical Team -I&C Team -Painting and Insulation Team -Shop Fabrication Team Each team is headed with a specialty team manager who reports to Construction Manager. b) The Construction Manager will work closely to control schedule and quality of site works. He shall take adjustment for any deviation from key completion date. c)He will coordinate the work sequence of each team manager and each specialty engineer. d)He will be in charge in the implementation of project safety procedures. Safety is the primary concern of his works. e)He shall liaise with QA/QC Manager for daily construction inspections. f)He will be fully responsible for technical communication and coordination with the Project Manager/ Site Manager and engineer, developing and reviewing the technical document such as drawings, specifications and procedures, interpreting and clarifying all the technical details to the project members, providing technical direction or instruction to quality personnel involved, proposing and reviewing corrective actions, conducting field engineering such as technical adaptation.