上传于:2015-05-13 14:44:32 来自: 电气
14
4.13分

Electrical construction including two strong design elements include : a part of the transformation and distribution system. power and lighting systems, mine grounding system. In general, building key changes include : high-voltage and low-voltage distribution systems systems, transformers, standby power system. power systems including power distribution and control; indoor and outdoor lighting system include all types of lighting; Lightning Protection System, including mine waves penetrated, lightning sensors, grounded, equipotential bonding and local equipotential bonding. Auxiliary equipotential bonding and so on. In such a short span of 20 years

建筑电气英文文献-图一

建筑电气英文文献-图一

建筑电气英文文献-图二

建筑电气英文文献-图二

建筑电气英文文献-图三

建筑电气英文文献-图三

建筑电气英文文献-图四

建筑电气英文文献-图四

建筑电气英文文献-图五

建筑电气英文文献-图五

点击立即下载源文件

特别声明:本资料属于用户上传的共享下载内容,仅只用于学习不可用于商业用途,如有版权问题,请及时 联系站方删除!

收藏
分享

微信扫码分享

点击分享

点击查看更多
全部评论 (14) 我要评论
  • 10

    qq_1442746913021 LV1

    很方便,很实用

    2017-03-04 18:09:40
点击查看更多讨论