上传于:2015-05-13 11:33:53 来自: 水利 / 工程设计 / 电站厂房
0
3.5分

The underground cavity is the hydroelectric project common building. Cavity water creep and drainage arrangement does not focus attention on frequently in the engineering construction initial period by the constructor. But to later period, even after the power generation, It will bring many thorny matters. Xilongchi Pumped-storage Power Station is too. For power plant construction, The constructor adopts many means for solution the question. This article has carried on the summary discussion to it, and hoped that draws out the question value.

西龙池抽水蓄能电站地下洞室防渗排水问题-图一

西龙池抽水蓄能电站地下洞室防渗排水问题-图一

西龙池抽水蓄能电站地下洞室防渗排水问题-图二

西龙池抽水蓄能电站地下洞室防渗排水问题-图二

西龙池抽水蓄能电站地下洞室防渗排水问题-图三

西龙池抽水蓄能电站地下洞室防渗排水问题-图三

西龙池抽水蓄能电站地下洞室防渗排水问题-图四

西龙池抽水蓄能电站地下洞室防渗排水问题-图四

西龙池抽水蓄能电站地下洞室防渗排水问题-图五

西龙池抽水蓄能电站地下洞室防渗排水问题-图五

点击立即下载源文件

特别声明:本资料属于用户上传的共享下载内容,仅只用于学习不可用于商业用途,如有版权问题,请及时 联系站方删除!

收藏
分享

微信扫码分享

点击分享

点击查看更多
全部评论 我要评论
暂无评论