Bidder shall, under the approval of municipal authority, implement the construction of No. 2 water supply project (drinking-water plant) with the capacity of 150,000 cubic meters daily water supply, and it is intended that part of the proceeds of the loan from World Bank will be applied to eligible payments for the purchase of equipment in accordance with the contract of project (Brief Description of the Goods herebellow ).
This study presents a nonlinear optimization technique (NOT) for conducting the back analyses of geotechnical engineering problems
based on the field observations. Additional auxiliary techniques are incorporated to enhance the convergence and stability of the NOT.
The developed NOT and additional auxiliary techniques are incorporated into a finite element code and then applied to the back analysis
of excavation-induced wall deflection. A number of hypothetical excavation cases with various scenarios of stratigraphy and two quality
excavation case histories are used to validate the developed NOT, in which the dominant soil parameters are treated as target parameters.
Results show that the wall deflections of all hypothetical and actual excavation cases at each stage can be accurately and efficiently backfigured.