3) 由C581引出10路10kV线路,分别为A507的四台变压器,B551的两台变压器,B553TDA装置氢气压缩机2台,C521盐酸装置氯气压缩机1台,盐酸压缩机1台提供电源。其中,变压器回路采用10kV截面为185mm2的三芯铠装电缆,马达回路采用10kV截面为95mm2的三芯铠装电缆。以上电缆线路均沿规划路径埋地敷设。10 10kV lines led from C581 are used to supply power to A507's four transformers, B551 two transformers, B553TDA 2 sets of hydrogen compressor unit, C521 hydrochloric acid chlorine gas compressor unit, and hydrochloric acid compressor unit respectively. Among them, transformer circuit uses x 3-core armored cable with 10kV cross-section 185mm2, motor circuit uses three-core armored cable with 10kV cross-section 95mm2. All cable lines will be laid underground along the planning path.
5) 控制电缆回路: Control cable circuit: 安装在HCL装置现场的3.6MW马达上的电流信号通过一根直埋敷设的铠装控制电缆直接接入10KV开关柜。The current signal installed on 3.6MW motor in the HCL devices site passes through a buried armored control cable direct access to 10KV switchgear. 由变压器出线柜去C581以外的变压器,采用两根分别为10*2.5mm2、4*2.5mm2屏蔽铠装控制电缆,由中压转接柜引出,与中压电缆同路径敷设至相关变压器室。其中,10*2.5mm2电缆直接接至温控箱,4*2.5mm2电缆可集中从某间变压器室引出,沿桥架至相关PCS楼ATS柜。Transformer outlet cabinets are connected to other transformers not in C581 by using two 10 * 2.5mm2, 4 * 2.5mm2 shield sheathed control cable respectively. The 10 * 2.5mm2 cable directly is connected to the temperature control box and 4 * 2.5mm2 cable are led out from transformer room, along the bridge to the relevant PCS floor ATS cabinet.
?工程名称:***风电临港500MW 叶片和机舱项目 Project Name: *** Lingang 500MW Blade and Nacelle Project ?建设单位:风力发电叶片***(上海)有限公司 Building Company: *** WIND POWER BLADE (SHANGHAI) Co. LTD. ?设计单位: Design Company: 管理顾问: Administrative Consultant: ?建设地点:上海****新城**园区**路以西、**路以南地块。 Construction site: site locates west to **Road and south to**Road, both roads are within *** Zone of ****, ***District, Shanghai. ?工程规模:Project Scale 项目占地总面积为34771.04m2,该工程总建筑面积约为40770.05m2本工程项目由1#、2#生产厂房、卫门喷漆间、垃圾间及自行车棚,室外道路及绿化工程等。
?工程名称:***风电临港500MW 叶片和机舱项目 Project Name: *** Lingang 500MW Blade and Nacelle Project ?建设单位:风力发电叶片***(上海)有限公司 Building Company: *** WIND POWER BLADE (SHANGHAI) Co. LTD. ?设计单位: Design Company: 管理顾问: Administrative Consultant: ?建设地点:上海****新城**园区**路以西、**路以南地块。 Construction site: site locates west to **Road and south to**Road, both roads are within *** Zone of ****, ***District, Shanghai. ?工程规模:Project Scale 项目占地总面积为34771.04m2,该工程总建筑面积约为40770.05m2本工程项目由1#、2#生产厂房、卫门喷漆间、垃圾间及自行车棚,室外道路及绿化工程等。