镀锌钢管明敷设 Open Lay of Galvanized Steel Pipe 本工程明敷设钢管均采用了镀锌钢管明敷设工艺。 All open-lay steel pipes in the project adopt the open-lay technology of galvanized steel pipe.
项目名称: 本工程涉及三个变电站,分别是现有的220/35kV A472变电站、现有的35/10kV B301S变电站以及新建的35/10kV C581变电站,工作内容为三个变电站之间和从三个变电站接至MV用户的电力电缆、控制电缆、接地电缆敷设所需电缆沟的开挖工程。The project involves three substations, namely the existing 220/35kV A472 substation, the existing 35/10kV B301S the 35/10kV C581 substation and a new substation. This is the power, control and grounding cable trench excavation project among three substations and for MV users connected to the three substations.
本工程共有碳钢管道7581m,碳钢管道焊接是本工程施工的重点,直接影响施工质量的好坏,所以我们应高度重视,保证工程的施工质量。 Carbon steel piping in this project is 7581 meter long, so welding work for carbon steel piping is one of the most important work in the construction. We will pay high attention on this, to guarantee quality of this project.
本合同由如上列明的甲、乙双方按照《中华人民共和国合同法》、《建筑安装工程承包合同条例》以及国家相关法律法规的规定,结合本合同具体情况,于xx年x月x日在xx签订。 This contract is signed by the two Parties in xxxx on xxxx according to the “Contract Law of the People’s Republic of China”, the “Regulation on Building and Installation Contracting Contract”, and other relevant national laws and regulations, as well as the specific nature of this project